CIVZU AI CIVIL ENGINEERING TASK FORCE FREE SIGNED-IN DEMO · EARLY-ACCESS SEATS BY INVITATION
MODULE 05 / 12 · GRADING & EARTHWORKS

Balance the site
before you break ground.

Grade pads, slopes and retaining walls against the terrain, then measure cut and fill, mass haul, topsoil and subgrade for every alternative. Quantities carry their method and assumptions with them.

24 capabilities11 in developmentAgent-ready
Grading & earthworks: app capture of an illustrative sample projectAPP CAPTURE · ILLUSTRATIVE PROJECT
WHAT IT DOES

Grading & earthworks
capabilities.

Your engineers work in the desktop workbench; your agent reaches the same project through typed local tools. Items tagged In development are being built now.

Grading

In development

Parent-child grading families

Grading families where child grading objects follow a parent recipe.

Offset and grade rules

Grade from feature lines with an offset and grade rule.

Daylight to surface

Grade from a feature line out to daylight on a selected surface.

Cut and fill slopes

Apply cut or fill side slopes to grading.

In development

Benches and stepped grading

Benched and stepped side-slope grading.

In development

Pond and basin grading

Grade pond banks and basins inward to a base level.

Building pads

Create building pads relative to existing terrain.

In development

Kerb and channel grading features

Generate kerb and channel features within site grading.

In development

Footway, verge and site-edge grading

Grade footways, verges and site edges.

Feature-line level editing

Edit feature-line vertex levels.

Slope, grade and interpolation editor

Set fixed slopes and grades and interpolate levels along feature lines.

Join and split grading

Join and split grading objects.

Dynamic offsets and merged lines

Offset feature lines that stay linked to their source and merge feature lines.

Slope arrows and grade labels

Downhill slope arrows with percentage and 1:n labels on cut/fill views and grading sheets.

Grading diagnostics

Grading reports conflicts and missing targets instead of producing a wrong result.

Retaining walls

Retaining-wall geometry

Retaining walls from alignment and profile geometry, including curved and parallel walls.

Wall assemblies and joints

Continuous wall assemblies with construction and expansion joints on curved and parallel walls.

Wall stem and footing quantities

Material quantities for retaining-wall stems and footings.

Landscape

In development

Path-based parametric extrusion

Extrude parametric profiles along a path to model linear features.

In development

Plant data tables

Plant properties driven from your own data tables.

In development

Landscape libraries

Landscape styles and object libraries.

In development

Dual elevation labels

Points and labels showing two elevations, such as top and bottom levels.

Earthworks and quantities

Cut and fill volumes

Existing-versus-design cut and fill volumes.

Topsoil stripping quantities

Stripping depths and topsoil quantities.

Subgrade depths by region

Subgrade depths set per site region.

Layered material quantities

Layered soil and material quantities.

Sectional cut and fill areas

Ground-versus-design cut and fill areas at sections.

Average-end-area volumes

Volumes by the average-end-area method.

TIN volumes

Volumes by TIN-to-TIN integration.

Shrink, swell and bulking factors

Apply your declared shrink, swell and bulking factors to volumes.

In development

Regional cut-fill colour maps

Cut and fill maps classified into colour bands by region.

Overlap trimming

Trim overlapping quantities within each design tool.

In development

Planting quantities

Landscape planting quantities by species and density.

Spreadsheet report export

Export quantity reports to XLSX workbooks.

Quantity change comparison

Compare drainage and mass-haul quantities between revisions with an audit trail.

HAND IT TO YOUR AGENT

Three briefs to start with.

BRIEF 01

“Grade Pad A at 128.5 m with 1 in 2 cut and 1 in 3 fill and daylight it to existing ground.”

BRIEF 02

“Compare cut, fill and haul for the two platform levels and recommend one.”

BRIEF 03

“Export the topsoil strip and subgrade quantities by area to a workbook.”

Put Grading & earthworks to work.

Reserve your early-access seat. We confirm your MCP client, seat count and commercial details before access opens.

Reserve your seat ↗